Ramsey Winch H-89 User Manual
Page 14
14
INSTRUCTIONS FOR OVERHAUL OF RAMSEY
MODEL H-89 DOW-LOK
®
DIS-ASSEMBLY
Refer to parts list and parts drawing pages for actual
item numbers and corresponding part numbers.
FIGURE 1
Drain oil from gear housing by removing
pipe plug #88 from gear housing. Shift clutch
into engaged “IN” position. If equipped with
air shifter, remove air shifter cover #43,
cotter pin #75, and clevis pin #76. Remove
air shifter sub-assembly #5. Remove frame
angles #7 & #8 from winch assembly.
FIGURE 2
Remove two capscrews #53 from clutch
housing #21 and unlatch shifter assembly #34.
Remove clutch housing from end of drum shaft.
Press in on retainer plate #93, to relieve the
spring tension and remove the retainer ring #96.
Remove four cap screws #44, retainer plate
#93, springs #99 and spacer #35.
FIGURE 3
Slide the locking ring #14 from the clutch.
NOTE: The locking ring cannot be removed
unless the clutch is engaged, with dowel pins
#90 seated in the shaft keyways.
Rotate the drum so the eight balls #39 and four
dowel pins #90 can be removed.
If necessary, the clutch #13 may be
disassembled from the drum by removing eight
capscrews #50. Slide drum #18 from drum
shaft.
FIGURE 1
FIGURE 2
FIGURE 3