2 installation checklist – IEI Integration KINO-9652 v1.00 User Manual
Page 94

KINO-9652 Mini-ITX SBC
Page 72
o
When working with the KINO-9652, make sure that it is disconnected from
all power supplies and that no electricity is being fed into the system.
Before and during the installation of the KINO-9652 DO NOT:
Remove any of the stickers on the PCB board. These stickers are required for
warranty validation.
Use the product before verifying all the cables and power connectors are
properly connected.
Allow screws to come in contact with the PCB circuit, connector pins, or its
components.
5.2.2 Installation Checklist
The following checklist is provided to ensure the KINO-9652 is properly installed.
All the items in the packing list are present
The CPU is installed
The CPU cooling kit is properly installed
A compatible memory module is properly inserted into the slot
The jumpers have been properly configured
The KINO-9652 is inserted into a chassis with adequate ventilation
The correct power supply is being used
The following devices are properly connected
o
IDE device
o
SATA drives
o
Power supply
o
USB cable
o
Serial port cable
The following external peripheral devices are properly connected to the
chassis:
o
Audio device
o
VGA screen
o
Keyboard
o
Mouse
o
RS-232 serial communications device