beautypg.com

Alamo Machete T 7740 User Manual

Page 67

background image

© 2005 Alamo Group Inc.

2-9

MACHETE

SERVICE BULLETIN No. 962703

Alamo Industrial Technical Services Department

1502 East Walnut

Seguin, Texas 78155

830-372-2708

Frame Rail Reinforcement, LH Frame Rail:

Subject:

Add Gusset to Left Frame rail of certain A-Booms and Machetes

Service Required:

1.

Weld Gusset, P/N 02970138 to left frame rail as instructed on installation drawing which will be
sent with Gusset when ordered.

2.

When welding some thing on a square tube do not weld across the square tube, that will weaken
the square tube. Always try to weld the length of the tube on the corners.

3.

Paint Gusset and welded area.

Parts Required:

Part No.

Qty

Description

02970138

1

Gusset

-------------

1

Can Spay Paint, High Gloss Black (Obtain Locally)

Models:

Machete Boom Mowers & A-Boom Mowers

Date:

Mar. 27, 1996

Bulletin No:
962703
(Old # 960003)

Parts:

100 % at Dealer Net

Labor:

1.0 hr. at Dealer registered
Shop Rate

Termination Date:

Oct. 1, 1996

Old Parts Disposition:

No Returnable Parts
involved

Warranty Compensation will be provided following proper filing of warranty claim in accordance with
the Alamo Industrial Warranty Policy. Claim allowance may vary in accordance with laws governing a
specific region. Any Warranty associated with this service bulletin must be within authorized dates.

Gusset 02970138

DO NOT Weld across square tubing when welding

Left Frame Rail

Rear

Front

Weld to outside
of Frame Rail

Figure 1