beautypg.com

Burkert Type 2101 User Manual

Page 32

background image

32

Maintenance,Cleaning

WarninG!

risk of injury from parts jumping out!
When the spindle opening is exposed, the individual parts of the
packing gland are pressed out at an undefined speed when the
pilot air ports is pressurized.

▶ Before pressurizing with control air, safeguard the ambient area

of the discharge opening (e.g. place spindle on a firm base).

control function a and i Pressurize pilot air port 1 with 6 – 8
bar (see “Fig. 24: Designation parts”).

control function B Pressurize pilot air port 2 with 6 – 8 bar (see
“Fig. 24: Designation parts”).

Grease the individual parts of the new packing gland with the
upplied lubricant.

Connect the individual parts to the spindle in the specified
direction and sequence (as illustrated in “Fig. 29: Seal set for
packing gland”).

Push packing gland into the packing gland tube.

Screw spindle guide / VA spindle guide back in using the socket
wrench / open-end wrench. Observe torque (see “Tab. 7: Tight-
ening torques of spindle”).

Support ring
Upper chevron seals
Upper pressure ring
Pressure spring

Lower pressure ring

Lower chevron seals

Spindle guide

Insertion direction

for packing gland parts

Spacer

SP10 / SP14

SP22

VA spindle guide

8)

Fig. 29: Seal set for packing gland

tightening torques of spindle
spindle diameter

tightening torque [nm]

10 mm

6

14 mm

15

22 mm

60

Tab. 7: Tightening torques of spindle

8)

Is not included in the seal set

english

Type 2101