beautypg.com

Precast pads, 2 precast pads, 0 site preparation, continued – Alpha Technologies Radium MiniBay User Manual

Page 40: Front of pad sweep opening, Front of pad

background image

40

044-001-C0-00, Rev. C

Fig. 4-2, Precast Pad Dimensions for Single Enclosure

(P/N 641-110-10)

4.0

Site Preparation, continued

4.2 Precast Pads

The type of enclosure mounting pad is determined by the size of the enclosure (single bay,

single bay with side chamber, dual bay, dual bay with single side chamber, and dual bay

with dual side chambers). Typically, Alpha Technologies recommends using precast polymer

mounting pads. These pads are designed for proper cabinet support and ease of installation.

Drilling areas for openings are indicated for coax and service sweeps, and pre-installed

threaded inserts for enclosure attachment.

RAD-MB

44" SYMM.

4-1/2"

10-/4"

8-1/2"

2-1/4"

5-1/2"

-5/8"

4-5/8"

2" SYMM.

27-/4" SYMM.

42

" SY

M

M

.

0

" SY

M

M

.

25

-7

/8

" SY

M

M

.

24

" SY

M

M

.

Front of Pad

Sweep Opening

3" MIN.

Front of Pad