beautypg.com

Installation — stage four, cont’d – Extron Electronics PoleVault Systems PVS 305SA User Manual

Page 34

background image

PoleVault Systems Installation • Installation — Stage 4

2-23

Installation — Stage Four, cont’d

b.

Screw the UPB 25 adjuster plate back onto the base of the

pipe and tuck the cables through the back of the adapter

plate.

c.

Replace the projector (with the UPB 25 bracket attached)

on the adjuster plate and tighten the adjuster plate

locking nuts.

d.

Connect the switcher’s VGA and RCA cables to the

projector.

e.

Connect the IR/RS-232 projector control cable to the

projector.

f.

Connect the projector power cord, ensuring the cord

exits via the cable notch in the PMK cover plate.

4b

Reattach UPB bracket and

4c

projector

4d

Cable the projector