PoleVault Systems Installation • Installation — Stage 1

2-3

Installation — Stage One, cont’d

1. Mark screen location

a.

Mark the center line and the outer edges of the screen.

T

When marking the location of screens, devices, or the

site for installing transmitters and MediaLink control
devices, use painters tape to avoid wall surface damage.

When marking the center line of the screen,
where possible, keep it aligned with the center of the
ceiling tile. This makes the projector installation and
alignment easier.

b.

Mark any structural studs, utility pipes, conduits,

or fire-breaks before drilling the hardware holes.

Do not drill the holes at this time

.

2. Install projector to verify location

a.

Remove the ceiling tiles, and mark the maximum and

minimum throw distances on the T-frame. Refer to the

projector manufacturer’s installation manual for more

information.

b.

Place the PCM 340 over the T-frame, between the two

marks. Lightly tighten the T-frame securing screws. The

T-frame screws can be used on the outside or the inside

to secure the PCM to the T-frame.

N

Place the PCM 340 on the T-frame so that the

pipe adapter slides left to right in relation to the

proposed screen location, rather than towards and

away from it. This makes aligning/centering the

image easier.

c.

Slide the slotted pipe up into the pipe adapter. Adjust

to the desired height and align the location holes and

pipe holes. Insert the location screw, lightly tightening it

down using a 5/32 inch hex wrench. Insert and lightly

tighten down the set screws onto the pipe. Do not

overtighten as the pipe is removed and replaced later

during installation.

d.

Take the UPB 25 and back out the set screws using a

3/32 inch hex wrench on the top portion of the adjuster

plate (see

a

below), and then screw the plate onto the

base of the pipe. Align it so the security flange is at the

rear.

Adjuster Plate
Locking Screws (4)

Projector

Bracket

Adjuster
Plate

Loosen the four Adjuster Plate
Locking Screws and slide the
Adjuster Plate away from the
Projector Bracket

a

b

Set Screws (2)

Security flange

PCM 340

Minimum/Maximum
Throw Distance Marks

2b

Place the PCM 340 on the T-bar

1a

Mark the screen location

2c

Insert and secure the slotted pipe

2d

Screw the adjuster plate onto the base

of the pipe.

Align Pipe holes with
location screw holes.

Insert location screw
and secure.