beautypg.com

Stage three - install the ff 120 ceiling speakers, Stage three, Install the ff 120 speakers – Extron Electronics PoleVault Systems PVS 305SA User Manual

Page 27: Stage 3, Stage three — install the ff 120 ceiling speakers

background image

2-16

PoleVault Systems Installation • Installation — Stage 2

Stage Three — Install the FF 120 Ceiling Speakers

Stage 3

This stage involves installing the devices shown below.

Where it goes:

Installs in ceiling tiles at predetermined location for best acoustics. Connects to switcher.

What it does:

Receives and outputs audio signal from PVS 305SA switcher

FF 120 Flat Field Ceiling Speakers

Anchor Rings (2)

Cable Clamps (2)

Terminal Cover

T-rails (2)

FF 120 Speaker (2)

Seismic Tabs (3 per side)

SPK 18, 35 ft

Speaker Installation:

Speaker cable (connects ceiling speakers to the PVS 305SA switcher)

Cables