Pull the cables (at the switcher location), Installation — stage four, cont’d – Extron Electronics PoleVault Systems PVS 305SA User Manual
Page 32
PoleVault Systems Installation • Installation — Stage 4
2-21
Installation — Stage Four, cont’d
2b
Gather the cables, pass them down
the pipe.
PoleVault
Switcher
Power
Supply
Projector
Pole
Cable Access
Slot
1
1
1
4
2
3
3
4
5
6
To Projector
Cables from A/V wall plates, MLC 104 IP Plus,
and FF 120 speakers.
Optional accessory cables from the VoiceLift and
Page Sensor may also be included.
4
IR/RS-232 projector control cable
5
6
VGA cable
Video RCA cable
Cables to Projector
1
2
3
FF 120 speaker cables
MLC 104 IP Plus switcher control cable
A/V wall plate cables, CAT 5
Cables to PVS 305SA
N
Not all cables that may need to be installed are shown here.
5
6
3
2
1
1
Switcher and projector cable overview
2. Pull the cables (at the switcher location)
a.
Gather all the cables from the speakers, A/V wall plates,
MLC 104 IP Plus controller, and any installed optional
devices that have been run to the switcher location, and
pull them down through the ceiling hole and the pipe.
These cables are:
• the MLC power/RS-232 cable
• the CAT 5 input cables from the wall plates
• the speaker cables
• the MLC to projector (IR/RS-232 projector control)
cable
• any optional device cables (e.g. Aux audio input
Priority Page Sensor Kit, VoiceLift etc.)
b.
Pull the cables out of the pipe slot towards the switcher,
ready for connection. Leave the IR/RS-232 projector
control cable to hang out of the bottom of the pipe.
c.
Connect the output video signal cables (VGA and RCA)
to the switcher and pull the loose ends down the pipe so
that they hang out the pipe with the IR/RS-232 projector
control cable. These cables connect to the projector later.
N
Do not thread any high voltage power cabling,
such as power supply or projector power cords,
through the projector pipe. This violates National
Electrical Code.