Outline of installation steps, Installation overview – Extron Electronics PoleVault Systems PVS 305SA User Manual
Page 12
PoleVault Systems Installation • Installation
2-1
Installation Overview
This overview outlines the basic steps for installing the PoleVault System. Detailed description of these steps is given
in five sections, Stages One though Five.
N
Additional installation hardware is needed and should be supplied by the installer. See Introduction, “Items not
included” on page 1-8, for a list.
Optional accessories may be desired for this installation. For a list see Introduction, “Optional items”, on
page 1-8, or visit
Refer to local building standards and codes to verify that the installation will meet all the regulatory requirements.
Observe all local and national building and safety codes, UL requirements, and ADA Accessibility Guidelines.
Refer to the specifications at the end of this guide for system hardware weights and dimensions.
Carefully check inventory of PoleVault system packages, input and output devices, any optional accessories, and
installation hardware before commencing.
Outline of installation steps
Stage One — Install the Screen and Projector.
c
Mark the screen location (page 2-3).
c
Install projector to verify location (page 2-3).
c
Verify the image location (page 2-4).
c
Cut the ceiling tile (page 2-5).
c
Preliminary safety hardware installation (page 2-5).
c
Finish projector drop ceiling mount installation (page 2-6).
c
Secure the projector drop ceiling mount to the ceiling (page 2-6).
c
Install the electrical box (if required) (page 2-7).
c
Install the screen (page 2-7).
— Install the A/V Source Input Wall Plates and MLC 104 IP Plus.
c
Install the mud rings (page 2-10).
c
Pull cables (at the input locations) (page 2-11).
c
Install the wall plates (page 2-12).
c
Install the MediaLink Controller (page 2-13).
— Install the FF 120 Speakers.
c
Cut the ceiling tile (page 2-17).
c
Install the speaker on the drop ceiling (page 2-17 ).
c
Terminate the speaker cable for the PVS switcher (page 2-18).
— Install the PMK 550 and the PVS 305SA.
c
Install the PMK 550 base plate (page 2-20).
c
Pull the cables (at the switcher location) (page 2-21).
c
Finish installing the pole mount kit (page 2-22).
— Configure the switcher and the system.
c
Configure the switcher — MLS Switcher Configuration program (page 2-24).
c
Configure the system — Global Configurator (page 2-25).
c
c
Final installation (page 2-27).
Where possible in the following pages, line drawings and photos from an actual installation are used to clarify some
of the steps discussed in the text. Each image has a number (e.g.,
Ñ
) corresponding to the particular step described.