beautypg.com

Installation — stage one, cont’d, Install the electrical box (if required), Install the screen – Extron Electronics PoleVault Systems PVS 305SA User Manual

Page 18

background image

PoleVault Systems Installation • Installation — Stage 1

2-7

Installation — Stage One, cont’d

8. Install the electrical box (if required)

W

All electrical installation should be

performed by qualified personnel in

accordance with local and national

building codes, fire and safety codes,

and local and national electrical codes.

If required, the following method is recommended for

integrating a 4S Raco electrical box (not supplied) on the

PCM base plate (e.g., a Raco 231, 2 1/8 inch deep, 4x4 inch

electrical box and a Raco 778, 1/2 inch raised, 4x4 inch

plaster ring or similar).
Install the Raco box on the PCM plate as follows:
a

. Attach the box to the plate, using the smallest notches

in opposite corners of the cut-out (see figure 8a). Do not

tighten the screws fully at this time.

b

. On the opposite side of the PCM plate, slide the plaster

ring under the screws. The plaster ring anchors the box

in place with PCM plate sandwiched between.

c

. Fully tighten the screws.

W

For safety, complete all wiring of the

electrical boxes and accessories after the
plate is fully installed and secure.

d

. Mark and cut a hole in the ceiling tile for the electrical

box opening.

9. Install the Screen

a.

Following the screen manufacturer’s guidelines, continue

to install the screen mounting brackets and then hang the

screen.

T

Use S-hooks to hang the screen from the brackets. Bend

the ends of the S-hooks so the screen does not fall when
it is rolled up.

Use the smallest
notches when
attaching the
Raco box.

Raco 231

Raco 778

8a

Install Raco box and plaster ring