Veris Technologies VIS_NIR Spectrophotometer Probe - Operating Instructions User Manual
Page 50
OM17-P4000VIS-NIR
5-13
Installing on Tractor
–
- All bushings and pins are provided for Category I and II three-point hitches.
- Connect lower links
– make sure you include the stabilizer link bushings(Figure
26)
- Connect top link
- Raise three point to desired height and level with top link
-
Install lower stabilizer mount on drawbar and tighten 5/8” bolts
- Connect LH and RH stabilizer to upper and lower points, adjust, and lock with
jam nut.
- Connect hydraulic hoses noting P and T
- Retract stabilizer stands and engage hydraulics -- locking valve into detent with
tarp strap or other device. Make sure that flow is correct or controls will be
backward.
Figure 25
Fold and
Extend hoses
Disconnect
wiring
Figure 26
Stabilizer
link bushing