Receipt of goods and storage, Installation instructions – M&C TechGroup MP26-H1 Operator's manual User Manual
Page 9
9
Gas sampling and gas conditioning technology
5-2.1.5-ME
10
RECEIPT OF GOODS AND STORAGE
Please take the sample pump and possible special accessories carefully out of the packaging
material immediately after arrival, and compare the goods with the items listed on the delivery
note!
Check the goods for any damage caused during delivery and, if necessary, notify your trans-
port insurance company without delay of any damage discovered.
N O T E !
The equipment should be stored in a protected, frost-free room.
11
INSTALLATION INSTRUCTIONS
When installing the pump make certain that accident prevention regulations and safety instructions
including those for subsequent operation are observed. The safety instructions must be observed.
N O T E !
The pumps may only be used for their intended purpose.
The pump must only be used in the conditions specified in the
technical data.
Specific safety instructions concerning sample must be observed.
The pump should be installed away from heat sources and freely
ventilated to prevent any accumulation of heat.
The pumps have no protection against water. In this case, as far as
it is relevant, measures to protect the pump must be taken before
start-up.
For outdoor installation, the pump must be installed in a housing
protected from frost in the winter and sufficiently ventilated in
summer. Exposure to direct sunlight must be avoided.
The protection class of the pumps MP26-H1 is IP44.
W A R N I N G !
It is essential to provide protection for persons against contact
with live parts (e.g. electrical connections, motor windings) and
moving parts (e.g. fan). Protection against the entry of foreign
bodies must also be provided.
N O T E !
Pumps have mechanical moving parts that can induce vibrations.
To prevent damages at the pump or at peripheral components /
facilities as well as minimizing noise development an appropriate
vibration decoupling is necessary. For this M&C can deliver e.g.
anti-vibration pads.
This explicit is also valid for the connection of the sample lines at
the pump head.