beautypg.com

Figure 3, Electrical connection – M&C TechGroup MP26-H1 Operator's manual User Manual

Page 11

background image

11

Gas sampling and gas conditioning technology

5-2.1.5-ME

N O T E !

Take care that safety regulations are observed when connecting the pump to
the power supply.

Attention must be paid to the requirements of IEC 364 (DIN VDE 0100) when
setting high-power electrical units with nominal voltages of up to 1000 V,
together with the associated standards and stipulations.

Check the details on the type plate to ensure that the equipment is con-
nected up to the correct mains voltage.

A main switch and matching fuse must be provided externally (EN 60335-1).

For electrical details see technical data.

Remove the lid of the connection box. The electrical connection layout is located in the lid.

Insert the mains cable (min. 3 x 1.5 mm²) through the threaded cable gland and connect to the

appropriate terminals (s. Fig.3).

Insert the signal cable through the treaded cable connection and connect to the appropriate

terminals (s. Fig.3).

Screw lid back on.

N O T E !

The earth-wire (ground) must be connected to the motor.

The pump must be installed so that contact with live parts (connections,
possibly windings) is impossible.



Figure 3 shows the electrical connection of the diaphragm pump.

Sensor

9

L

L

N

Reset

0-180°C

To>+30°C

Power

100W 100W

M

230V 50Hz
115V 60Hz

8

5 6 7

Tsoll

4

3

2

1

Tu<-30°C

10 11 12

Status contact

(ext. contact to switch pump motor OFF)

1,5A

ON

Figure 3

Electrical connection