Gas sampling and gas conditioning technology

2-1.0-ME

If the ambient temperature in the area of the connections is >80°C as a result of radiated heat, then a
radiated-heat deflector must be mounted to protect the probe.
The connection's mounting flange connection should comply with DN65 PN6. If other connection sizes
are required, a special adapter flange /S010 can be supplied as an option.

Before mounting, the probe must be adjusted to the existing operating conditions. The existing
operational parameters are to be checked accordingly prior to commencing mounting work.

weatherproof mounting position


_____present


_____set

Under / over pressure situation


mbar


bar

Process temperature

°C,
Min.

°C,
Max.

Dust loading


g/m³

Dust composition - grain size

µm

Gas composition


corrosive


toxic


explosive

Which parameters should be
measured, e.g. O

2

, CO, SO

2

, NO

X

,..,


Vol.%


mg/Nm³


ppm

Required amount of gas

l/h,
Min.

l/h,
Max.

Necessary T

90

time


sec.



12

MOUNTING

M&C SP2100-H probes are designed for stationary use and if properly selected and mounted a long
service life and minimum maintenance are guaranteed.
It is advisable to mount the probe in an operational position which is at a 10% inclination to the
process.

Checking the filter element:

Turn the U-bolt at the front end of the filter receptacle several times to the left until the retaining

bolt can also be turned sideways to the left.

Remove the filter receptacle from the probe and check whether the filter element is screwed on

tightly. Replace the filter receptacle

Place the retaining bolt in its original position and tighten the U-bolt.