15
Take away conveying belt
and remove the old hose set
from the guides by the hose
connectors;
Press the two contact pulleys
and check whether the spring pressure is still sufficient, if not,
the contact springs have to be changed see (14.2);
Put the new hose set
with the hose connectors into the guides of the conveying belt
;
N O T E !
Only the usage of the original hose set guarantees a perfect function.
Never lubricate the hose.
Before mounting the pump check all parts for impurity and clean if
necessary.
Put the conveying belt
with the new hose
into the dovetail guide of the pump body;
Press conveying belt at the recessed grips and simultaneously turn the S-bolt
anticlockwise
until it snaps;
Switch on pump.
14.2
CHANGE OF CONTACT PULLEYS AND SPRINGS
Switch off the mains;
Unscrew nuts of the pump head (wrench size 5,5) and remove snap ring from motor
shaft;
Figure 7 Disassembly of pump head and driver
Draw the pump head out of the motor shaft
Take driver out of the pump head
The removal of the springs (4 pcs.) away from the driver is easily possible without the aid of
any tools. For this take spring out of the groove
near to the shaft bore.
Dismount roller axes and change contact pulleys. Take care that axes are not worn out by the
springs and have damaged the dent at the axes front end. In case of abrasion the axes have to