Chapter 2 installation, Receipt inspection, Site preparation – Northern UTA220/UTA220k User Manual
Page 21: Chapter 2. installation
UTA220/UTA220k
2-1
Installation
Chapter 2
Installation
Installation of the UTA220/UTA220k is simple and straight
forward. Prior to installation, refer to Chapter 3 to either verify
or change strap options.
RECEIPT INSPECTION
After unpacking the equipment, check the contents against the
packing list. Inspect the equipment carefully for damage that
may have occurred in shipment. If there is damage or material
shortage, contact the shipping agent and Motorola for advice
and assistance. Motorola suggests that the shipping container
and packing material be retained for future shipment.
SITE PREPARATION
The installation area should be clean and free from extremes
of temperature, humidity, appreciable shock, and vibration.
Allow ample space at the rear of the UTA220 for cable
clearance and air flow. Install the UTA220 within 6 feet of a
115 or 230 VAC grounded outlet as required for the specific
model and no farther than 50 feet from the DTE.