Startup – Lochinvar COPPER-FIN 497 - 2067 User Manual

Page 47

background image

6

Startup

(continued)

Installation & Service Manual

Check thermostat circuit(s)

1. Disconnect the two external wires connected to the enable

terminals on the connection board.

2. Connect a voltmeter across these two incoming wires.

Close each thermostat, zone valve, and relay in the external
circuit one at a time and check the voltmeter reading across
the incoming wires.

3. There should NEVER be a voltage reading.
4. If a voltage does occur under any condition, check and

correct the external wiring. (This is a common problem
when using 3-wire zone valves.)

5. Once the external thermostat circuit wiring is checked and

corrected if necessary, reconnect the external thermostat
circuit wires to the connection board. Allow the boiler to
cycle.

Check vent and air piping

1. Inspect vent piping and air piping for signs of
deterioration from corrosion, physical damage or

sagging. Verify air piping and vent piping are intact

and correctly installed per this manual.

Placing the boiler in operation

Boiler operational checks

2. Turn the boiler main power switch to the “ON”
position.

3. Confirm the settings of the temperature control.
4. Push the reset for the low water cutoff (if equipped).

5. Ensure that maximum flow to the boiler does not exceed

55 GPM on Models 402 - 752 and 90 GPM on Models

992 - 2072. Verify by checking temperature rise while

burner is firing at 100% of rated input.

6. Install a manometer on the gas supply to the boiler and

verify minimum gas supply pressure as the burner fires at

100% of rated input.

7. Verify operation of safeties as necessary (low water

cutoff, high limit, gas pressure, etc.,).

Start the boiler

1. Read and follow the Lighting Instructions in FIG. 6-1, on

page 45.

If boiler does not start correctly

1. Check for loose connections, blown fuse or service switch

off?

2. Is external limit control (if used) open? Is boiler water

temperature above 200°F (93.3°C)?

3. Is thermostat set below room temperature?
4. Is gas turned on at meter or boiler?
5. Is incoming gas pressure less than 4 inches water column?
If none of the above corrects the problem, refer to the
Maintenance Section of this manual.

The venting system must be installed so that
it will prevent flue gas spillage and carbon
monoxide emissions, which will result in
severe personal injury or death.

ƽ WARNING

Check for gas leaks

Before starting the boiler, and during initial
operation, smell near the floor and around
the boiler for gas odorant or any unusual
odor. Remove the front access panel and smell
the interior of the boiler enclosure. Do not
proceed with startup if there is any indication
of a gas leak. Use an approved leak detection
solution. Repair any leaks at once.

ƽ WARNING

Propane boilers only – Your propane supplier
mixes an odorant with the propane to make
its presence detectable. In some instances, the
odorant can fade, and the gas may no longer
have an odor. Before startup (and periodically
thereafter), have the propane supplier verify
the correct odorant level in the gas.

ƽ WARNING

Boiler operation

8. Verify that all adjustable points in the Operator

Interface are set as required.

9. Boiler should begin the start-up process for the

sequence of operation.

10. The boiler will ignite and operate to meet the system
demand.

11. Ensure that inlet water temperature does not fall below

the specified minimum for the boiler.

12. As system demand is satisfied, the burner will cycle off

and the combustion air blower will run for a post

purge operation before the boiler shuts down.