Partner groups – Sun Microsystems Sun StorEdge T3 User Manual
Page 56
44
Sun StorEdge T3 and T3+ Array Configuration Guide • August 2001
Dual Hosts With Two Hubs and Eight Controller
Units Configured as Four Partner Groups
shows two application hosts connected through FC-AL cables to two hubs
and eight Sun StorEdge T3+ arrays forming four partner groups. This multi-initiator
configuration can be used for footprint and I/O throughput.
This configuration is a recommended enterprise configuration for RAS functionality
because the controller is not a single point of failure.
Note –
There are no hub port position dependencies when connecting Sun StorEdge
T3 and T3+ arrays to a hub. An array can be connected to any available port on the
hub.
When configuring more than one partner group or a single array to share a single
FC-AL loop, as with a hub, array target addresses need to be set to unique values.
Assign the array target address using the port set command. These target
addresses can be any number between 1 and 125. At the factory, the array target
addresses are set starting with target address 1 for the bottom array and continuing
to the top array. Use the port list command to verify that all arrays have a
unique target address. Refer to Appendix A of the Sun StorEdge T3 and T3+ Array
Administrator’s Guide for further details.
The following two parameters must be set on the master controller unit, as follows:
■
mp_support = rw
or mpxio
■
cache mode = auto
■
cache mirroring = auto
Note –
For information on setting these parameters, refer to the Sun StorEdge T3 and
T3+ Array Administrator’s Guide
Host-based multipathing software is required for this configuration.