50 operating manual, Hardware installation, Four processors – FUJITSU PRIMERGY RX600 S6 User Manual
Page 50: Eight hard disk drives and/or solid state disks, One optical drive, Rx600 s6, Table 3: maximum dc loading requirements
50
Operating Manual
RX600
S6
Hardware installation
©
c
og
ni
ta
s.
Ges
el
ls
ch
ft f
ü
r T
e
ch
ni
k-
D
ok
um
e
nt
a
tio
n m
bH
201
1
P
fad:
C:
\P
rog
ra
m
m
e\
F
C
T
\ti
m
_a
pp
\ti
m
_l
o
ca
l\w
or
k\
P
ICH
OL
\O
B
J_
D
OK
U
-1
1
93
8-
00
1.
fm
Installation requirements for AC non redundant configurations
For systems not requiring AC redundancy, the power supply subsystem can be
installed with up to 4 PSUs. The PSUs can be connected to a single or multiple
AC sources.
Three power supply modules are capable of handling the maximum power
requirements for a fully configured PRIMERGY RX600 S6 server system, which
include the following:
●
Four processors
●
1024 GB of memory
●
Eleven PCIe add-in cards (including the SAS/SATA RAID controller card)
●
Eight hard disk drives and/or solid state disks
●
One optical drive
●
One tape drive
The hot swap feature allows the user to replace a failed power supply module
without affecting the system functionality.
PSU Configuration
Max. DC Loading
DC Redundancy
1+1 (2 PSUs)
830W
Yes
2+1 (3 PSUs)
1580W
Yes
3+1 (4 PSUs)
2320W
Yes
Table 3: Maximum DC Loading Requirements