HP sv6 User Manual
Page 44
![background image](/manuals/92983/44/background.png)
installation and user information
installation process
Chapter 2
44
6. Verification
Run the verification test to verify that the cabling and network
information are correct:
•
log in to the master system as root
•
init 3
•
Log in at the CDE screen.
•
Open a terminal window and run:
/opt/graphics/OpenGL/bin/setpipes -test
WARNING
Do not use any other options with -test
•
If you see:
— Solid red, green or blue triangles rotating in each rectangle
(at varying speeds).
— Black background.
— Numbers are in order, left to right, top to bottom.
— PASS: System is Ready
•
If you see:
— Speckles.
— Strange color changes.
— Missing triangles.
— Unexpected patterns (e.g. checkerboard pattern, completely
black or red rectangle).
— FAIL: See the hp visualization center sv6 Troubleshooting
Guide at
http://www.hp.comgo/workstationsupport
to
correct the cabling or networking problem. Check the
verify.log
file created in the current directory.
•
Touch any key on the keyboard or press a mouse button to exit
the animation
•
Use
CTRL+SHIFT+BREAK
to get back to the log in prompt.
7. Configure ds2100