5 alternate power led, 5 installation of cpu – Endura RADISYS KP915GV User Manual
Page 17

KP915GV Product Manual
17
Tamper Switch
To make use of the tamper detection logic of the motherboard, connect a momentary switch
between pins 18 and 20. The switch should be open when the chassis is closed.
1.4.5
Alternate Power LED
The power LED function on the front panel connector is duplicated on the Alternate Power LED
connector for use with LEDs cabled to a 3-pin connector. Do not use both the primary (front panel)
and alternate connectors simultaneously.
1.5
Installation of CPU
1.5.1 Installation of CPU
Below is the CPU socket illustration. Follow these procedures to install a CPU.
1. Use thumb & forefinger to hold the lifted tab of the cap.
2. Lift the cap up and pick to upload the cap completely from the socket.
Load lever
Load Stiffener
Load cap
Load plate
Lifted tab