Setup and programming – Precision Digital PD6000 User Manual
Page 25
Model PD6000 Analog Input Process Meter Instruction Manual
25
SETUP AND PROGRAMMING
The meter is factory calibrated prior to
shipment to read in milliamps and volts
depending on the input selection. The
calibration equipment is certified to NIST
standards.
Overview
There are no jumpers to set for the meter input selection.
Setup and programming is done through the front panel buttons.
After power and input signal connections have been completed and
verified, apply power to the meter.