MCZ PowerTherm User Manual
Page 3

Contents
INSTALLATION AND USE MANUAL
page
3
Contents
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
INTRODUCTION ....................................................................................................................................5
1. WARNINGS AND GUARANTEE CONDITIONS.....................................................................................6
1.1.
SAFETY INSTRUCTIONS ..................................................................................................................6
1.2.
OPERATING WARNINGS ..................................................................................................................6
1.3.
GUARANTEE CONDITIONS ..............................................................................................................7
1.3.1.
Limitations...............................................................................................................................7
1.3.2.
Exclusions................................................................................................................................7
2. THEORETICAL NOTIONS FOR INSTALLATION ..................................................................................8
2.1.
Pellets............................................................................................................................................8
2.2.
PRECAUTIONS FOR INSTALLATION..................................................................................................9
2.3.
OPERATING AREA.........................................................................................................................10
2.4.
CONNECTION TO THE EXTERNAL AIR INTAKE ................................................................................10
2.5.
CONNECTION OF SMOKE DISCHARGE PIPE ....................................................................................11
2.6.
CONNECTION TO THE FLUE PIPE...................................................................................................12
2.7.
CONNECTION TO AN EXTERNAL FLUE WITH INSULATED OR DOUBLE-WALL PIPE .............................12
2.8.
CONNECTION TO THE FLUE PIPE...................................................................................................12
2.9.
OPERATING PROBLEMS CAUSED BY DRAUGHT DEFECTS IN THE FLUE .............................................13
3. INSTALLATION AND ASSEMBLY ......................................................................................................14
3.1.
DRAWINGS AND TECHNICAL CHARACTERISTICS ............................................................................14
3.2.
PREPARATION AND UNPACK ING ...................................................................................................15
3.3.
ASSEMBLING THE UNIT ONTO THE MASONRY BASE .......................................................................15
3.4.
INSTALLING THE LEG KIT (OPTIONAL) AND FASTENING THE UNIT TO THE FLOOR ..........................16
3.5.
REMOVAL OF COMPENSATION FRAME ...........................................................................................17
3.6.
INSTALLATION OF PELLET LOADING CHUTE (LINK) ........................................................................17
3.6.1.
Side installation of chute .........................................................................................................17
3.6.2.
Front installation of chute .......................................................................................................18
3.7.
CONTROL PANELS ASSEMBLED ON THE DOOR ...............................................................................18
3.8.
COMBUSTION AIR AND AIR FILTER ...........................................................................................19
3.9.
HOOD VENTILATION NOZZLES ......................................................................................................19
3.9.1.
Mask for drilling the holes for the standard hood ventilation grilles .............................................20
3.10.
HOT AIR OUTLET DUCTS ...........................................................................................................20
3.10.1.
Enforced ventilation component kit .......................................................................................20
3.10.2.
Vents applicable to the Forced Ventilation kit.........................................................................21
3.10.3.
INSTALLING THE FORCED VENTILATION KIT........................................................................21
3.10.4.
Variation for air outlet with container....................................................................................22
3.10.5.
Variation for air outlet with illumination.................................................................................22
3.10.6.
Ventilator electrics ..............................................................................................................24
3.10.7.
REPLACING THE FAN ..........................................................................................................24
3.11.
MAKING THE ELECTRICAL CONNECTIONS...................................................................................25
3.12.
REALIZATION OF CLADDING ......................................................................................................25
3.13.
INSULATING A WOODEN BEAM ..................................................................................................26
3.14.
INSTALLATION OF STANDARD MCZ CLADDING ...........................................................................26
3.15.
COMPENSATION FRAME ASSEMBLY ............................................................................................26
3.16.
INSTALLATION OF PELLET CHUTE DOOR AND CONTROL PANELS .................................................26
3.16.1.
Assembling the emergency panel and main switch ................................................................27
3.16.2.
Door assembly....................................................................................................................27
3.17.
OPENING/CLOSING PELLET DOOR..............................................................................................28
3.18.
DIAGRAM FOR MAKING HOLES ON CLADDING.............................................................................28
4. OPERATION .....................................................................................................................................29
4.1.
PRE-LIGHTING WARNINGS............................................................................................................29
4.2.
PRE-LIGHTING CHECK ..................................................................................................................29
4.3.
LOADING THE PELLETS.................................................................................................................30
4.4.
LCD REMOTE CONTROL ................................................................................................................31