Front installation of chute, Control panels assembled on the door – MCZ PowerTherm User Manual
Page 18
Chapter 3
INSTALLATION AND USE MANUAL
page
18
Installation and fitting
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
3.6.2. Front installation of chute
x
Connect the provided tube, being careful that the tube is
turned forward, and attach it with the strap.
x
Connect the tube to the hole in the door using the strap.
x
Position the tube in a way that renders it accessible once the
cladding is in place and that allows mounting the door structure
to the cladding.
x
To assemble the exterior door, refer to paragraph 3.16.2, since
this operation must be executed once the cladding is in place.
3.7.
CONTROL PANELS ASSEMBLED ON THE DOOR
Even if the assembly of the chute closure door is one of the last phases
of installation, it is obligatory to notify the installer that some very
important devices will be mounted on such component, such as the
emergency panel (see chapter 4.5) and the switch which allows voltage
to be cut off from the unit.
Therefore during this phase of the installation when the cladding has
not yet been installed, it is advisable to fasten the wiring and the
relative components pre-assembled by the manufacturer
alongside the pellet loading chute, so that when the door is
installed, with the cladding almost completed, the wires and panels will
be easily accessible.
You can use adhesive tape or something similar to hold them
temporarily.
Be very careful when handling electrical cables.
Avoid stretching them or crushing them as they
may be damaged.
If you want to anchor them in place, make sure
that they do not in any way come into contact
with the hot parts of the unit.
Failure to comply with the above may result in
damage to the electrical components which is not
covered by the guarantee.
- OFF
- REMOTE
- ON
- MIN
- MED
- MAX
A
B
C
D
E
F
G
TEST
Pellet loading door with control panel
Installation of the front chute