3.5.
REMOVAL OF COMPENSATION FRAME
To prevent damage to the finishing frame around the fire door, you
should remove it as soon as you have attached the legs and put it in a
safe place.
3.6.
INSTALLATION OF PELLET LOADING CHUTE
(LINK)
Before positioning the unit, you will need to decide on which side the
chute for fuel loading will be installed.
The Powerbox Link is provided with two straps, the connecting tube
and the chute with a small door.
The chute can be assembled on the right side, the left side or on the
front. The connecting tube is one meter long.
It is obligatory to shorten the connecting pipe in
accordance with its position (side or front), so that it
is firmly extended and forms a minimum angle respect
to horizontal as shown in section 3.1.
This operation is necessary to facilitate pellet descent.
Before assembling the cladding, execute a test by
loading the combustible fuel to make sure that the
pellets descend correctly towards the hopper.
It is mandatory to provide for correct insulation of the
tube if it is mounted on the left side near the smoke
exhaust.
MCZ declines any responsibility in case of non-
observance of the aforementioned warnings. Fire risk!
3.6.1. Side installation of chute
In case the chute is positioned on the side, the distance from the axis
of the machine to the wall must be at the most 80 cm (see figure).
To position the chute, proceed as follows:
x
Connect the provided tube to the Powertherm, being careful
that the tube is turned to the side, and attach it with the strap.
x
Connect the tube (in the upper part) to the hole in the door
using the provided strap.
x
Position the tube with the door frame in a way that it will be
possible to screw it in and mount it to the cladding near the
hole once the cladding is in place.
x
To assemble the exterior door, refer to paragraph 3.16.2, since
this operation must be executed once the cladding is in place.
Installation of side chute