MCZ PowerTherm User Manual
Page 20

Chapter 3
INSTALLATION AND USE MANUAL
page
20
Installation and fitting
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
3.9.1. Mask for drilling the holes for the standard
hood ventilation grilles
Whereas the position for drilling the holes for the ventilation air intake
and outlet nozzles is not fixed, but is established by the installer based
on where he wants to duct the tubes, for the hood ventilation nozzles
on the other hand, there are two fixed positions.
These positions can be identified by the mask shown here which
precisely illustrates the location of the grilles.
3.10. HOT AIR OUTLET DUCTS
PowerTherm has the possibility of distributing hot air according to the
ENFORCED CONVECTION method through the use of an forced
ventilation kit (supplied).
The kit is made up of two ventilating units (A) to be connected to the
unit.
In the environment of installation it will be appropriate to foresee an air
vent for merging fresh air having a free surface area no less than 150
cm
2
.(B)
3.10.1.
Enforced ventilation component kit
The forced ventilation kit is formed of:
1) Structure of air vent with ventilator (2 pieces);
2) Fastening bracket group (2 pieces);
3) Flexible hose d.100 L=1.5 m (2 pieces);
4) Pipe tightener tie d.60-170 (4 pieces);
5) Multi-directional air vents (2 pieces).
2
1
4
3
5
A
B
Installation of standard nozzles for hood
ventilation