Maintenance and Care

SMA Solar Technology AG

62

SMatrix-BEN095014

User Manual

4. Loosen the PG threaded joints on both cable feeds until the cable is moveable and the

connection box can flip downwards. Flip down the connection box.

5. loosen the screws in the terminals, to relieve the electricity cable.

6. Loosen the wires of the electricity cable with a slit screwdriver from the terminal strip.
7. Pull the electricity cable through the PG threaded joint from the connection box.
8. Guide the new electricity cable through the PG threaded joint.
9. Remove 50 mm of the cable cover.

10. Strip 8 mm off the insulated wires.