Procedure:

1. Attach the hoist to all lifting lugs of the high-voltage transformer. Ensure that the chains of the hoist do not touch the

low-voltage and high-voltage terminals of the transformer and that the surface of the transformer is not damaged.

2. Raise the crane hook slowly until the chains are taut.
3. Ensure that the hoist is attached correctly.
4. Slightly raise the high-voltage transformer.
5. Transport the high-voltage transformer as close to the ground as possible.
6. Transport the high-voltage transformer to the mounting location and set it down on the guiding rails provided for this

purpose at the back of the Transformer Compact Station.

7. Remove the lifting equipment from the anchoring points.

6.4 Installing the High-Voltage Transformer in the

Transformer Compact Station

The high-voltage transformer must be installed in the back of the Transformer Compact Station prior to the beginning of