SMA TCS 500SC-JP User Manual
Page 17
SMA Solar Technology AG
6 Transport and Mounting
Installation Manual
TCS-JP-IA-en-10
17
Procedure:
1. Attach the hoist to all lifting lugs of the high-voltage transformer. Ensure that the chains of the hoist do not touch the
low-voltage and high-voltage terminals of the transformer and that the surface of the transformer is not damaged.
2. Raise the crane hook slowly until the chains are taut.
3. Ensure that the hoist is attached correctly.
4. Slightly raise the high-voltage transformer.
5. Transport the high-voltage transformer as close to the ground as possible.
6. Transport the high-voltage transformer to the mounting location and set it down on the guiding rails provided for this
purpose at the back of the Transformer Compact Station.
7. Remove the lifting equipment from the anchoring points.
6.4 Installing the High-Voltage Transformer in the
Transformer Compact Station
The high-voltage transformer must be installed in the back of the Transformer Compact Station prior to the beginning of
installation.
Figure 10: Position of the high-voltage transformer before installation in the Transformer Compact Station, with guiding rails assembled