Table 4.5 Events caused by the self-test

4.2 Maintenance

Ensure that the heat sink at the rear of the inverter is not
covered.
Clean the contacts of the PV load-break switch once a year.
Clean by cycling the switch to on and off positions ten times.
The PV load-break switch is located at the bottom of the
inverter.
For correct operation and a long service life, ensure free air
circulation for the following areas:

• around the heat sink at the top and side of the inverter

where the air exhausts, and

• to the fan at the inverter base.

To clear obstructions, clean using compressed air, a soft
cloth, or a brush.

356–
361

Transistor and relay test failed or inverter
relay has failed (contact assumed
welded).

Contact the Service.

-

-

-

366

Residual-current monitoring unit (RCMU)
self-test failed.

Contact the Service.

-

-

-

ID

Description

Measure

DGO

Hotline PV