beautypg.com

In figure 13 o, Aspb installation – Grass Valley Profile Family Audio Signal Processing Board User Manual

Page 48

background image

ASPB Installation

48

ASPB Installation

Figure 13. Cabling example for boards with two connectors per channel

5. To connect the first Audio Clock Cable to ASPB2:

a. Connect one end of an audio clock cable to the ASPB2 Audio Clock1.

(ASPB2 is the ASPB installed in the higher numbered board slot.)

b. Connect the other end of the cable to Channel A of the video input board

in the next higher numbered board slot (

Ê in example Figure 14) or to

Channel B of the same video input board to which the previous ASPB1
clock cable was attached.

0047-13

1

2

3

4

ASPB

Video boards with two

connectors per channel

J1

J17

A

A

B

B

1

2

Ch. A

Ch. A

Ch. A

Ch. A

3

4

Rear of Unit