beautypg.com

Rack installation, Power supply, Installation tools – H3C Technologies H3C SecPath L1000-A Load Balancer User Manual

Page 14: Accessories

background image

6

Rack installation

Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other devices.

The equipment room is at least 3 m (9.84 ft) high and an air conditioner is installed.

Power supply

Make sure the power source of the installation site is steady and can satisfy the input requirements of

the power modules and parameters such as rated voltage. For the power module specifications, see

"

Power modules

."

Installation tools

The tools in the table might be used for installing the L1000-A.

Flat-blade
screwdriver

Phillips screwdriver Needle-nose pliers

Wire-stripping
pliers

Diagonal pliers

RJ-45 crimping
pliers

Marker Multimeter

Network cable
tester

Hot air blowing
gun

Accessories

Console cable (supplied
with L1000-A)

Grounding cable
(supplied with L1000-A)

Mounting brackets
(supplied with L1000-A)

Rubber feet (supplied
with L1000-A)

AC power cord (supplied
with L1000-A)

ESD wrist strap
(user-supplied)

Cable tie (user-supplied)

M6 screw (user-supplied)