Rack installation, Power supply, Installation tools – H3C Technologies H3C SecPath L1000-A Load Balancer User Manual
Page 14: Accessories
6
Rack installation
•
Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other devices.
•
The equipment room is at least 3 m (9.84 ft) high and an air conditioner is installed.
Power supply
Make sure the power source of the installation site is steady and can satisfy the input requirements of
the power modules and parameters such as rated voltage. For the power module specifications, see
"
."
Installation tools
The tools in the table might be used for installing the L1000-A.
Flat-blade
screwdriver
Phillips screwdriver Needle-nose pliers
Wire-stripping
pliers
Diagonal pliers
RJ-45 crimping
pliers
Marker Multimeter
Network cable
tester
Hot air blowing
gun
Accessories
Console cable (supplied
with L1000-A)
Grounding cable
(supplied with L1000-A)
Mounting brackets
(supplied with L1000-A)
Rubber feet (supplied
with L1000-A)
AC power cord (supplied
with L1000-A)
ESD wrist strap
(user-supplied)
Cable tie (user-supplied)
M6 screw (user-supplied)