beautypg.com

Ice thickness and water purge adjustment – Scotsman EH330 C with ECC Condensing Unit ECC1200 User Manual

Page 22

background image

EH330, EH430 and ECC Condensing Unit

Remote Low Side Cuber Service Manual

July 2013

Page 21

Ice Thickness and Water Purge Adjustment

Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.

2. Remove evaporator cover.

3. Remove left curtain.

4. Use a hex wrench and rotate the bridge thickness

adjustment screw in 1/16 turn increments CW to

increase bridge thickness.

5. Rotate CCW to decrease bridge thickness.

Caution: Do not make the bridge too thin or the

machine will not harvest properly. Bridge thickness

adjustments are not covered by warranty.

6. Return curtain and evaporator cover to their

normal positions.

7. Push and release the On button. Check next

harvest of ice. Repeat steps 1-6 if needed.

Water Purge Setting
The water purge is factory set to the automatic

position, suitable for most water conditions. The

setting can be changed to one of 5 manual settings or

left on automatic.

Setting Water Type
1

Minimum - RO water or equivalent

2

Moderate - Low TDS, non RO

3

Standard - Use with typical water

4

Heavy - High TDS

5

Maximum - Very high TDS

A

Automatic - Factory setting

To set:

1. Switch the machine OFF by holding the Off button

in until a number or the letter A shows on the

display.

2. Press and release the On button repeatedly until

the number on the display corresponds to the

desired setting.

3. Press and release the Off switch again to return to

the normal control state.

TOO BIG

JUST RIGHT

TOO SMALL

1/8 to 3/16”

Bridge

Small Depression

Adjustment

Screw

This manual is related to the following products: