beautypg.com

Connect refrigeration – Scotsman EH330 C with ECC Condensing Unit ECC1200 User Manual

Page 18

background image

EH330, EH430 and ECC Condensing Unit

Remote Low Side Cuber Service Manual

July 2013

Page 17

Connect Refrigeration

Requires brazing, steps must be performed by an

EPA certified type II or higher technician.

At Head:

1. Remove protective plugs from all three

connections and vent the nitrogen from the ice

machine.

2. Route the each of the three tubes to its

connection.

3. Remove the top panel and attach a refrigeration

hose with depressor to the 1/2 inch ID vapor line

access valve so the valve is OPEN. This is a vent

for nitrogen purging.

4. Clean tubing ends and position into the couplings.

At Condensing Unit

1. Confirm connection

valves are fully

closed.

2. Remove protective

plugs from all three

connections.

3. Remove caps from access valve connections.

4. Remove cores from access valves.

5. Connect refrigeration hoses to access valves.

6. Connect dry nitrogen source to liquid line

connection and vapor line connection.

7. Shorten tubing to correct length, clean ends and

insert them into valve stubs.

Note: Be sure tube and stubs are round, dress with

swage tool if needed.

8. Add heat sink material to ball valve body.

9. Open nitrogen and flow 1 psi nitrogen into liquid

line and vapor line tubes and braze the liquid

line, vapor line and suction line tubes to the valve

stubs.

At Head

1. With nitrogen flowing from condensing unit, braze

the liquid, vapor and suction line connections.

2. Remove refrigeration hose from head. Be sure

valve cap is on tight.

At Condensing Unit

1. Remove nitrogen supply.

2. Return valve cores to access valves.

3. Connect vacuum pump to all three access valves

and evacuate the tubing and head to at least a

300 micron level.

4. Remove vacuum pump and add R-404A vapor to

all three tubes to provide a positive pressure.

5. Leak check the braze connections and repair any

leaks.

6. Open all three valves to full open.

Note: The full refrigerant charge is contained in the

receiver of the condensing unit.

Valves Closed

Refrigeration Connections

This manual is related to the following products: