beautypg.com

Installation of the unit – REMKO GPM 15 User Manual

Page 5

background image

5

Installation of the unit

Area of application

REMKO GPM series gas wall
heaters are used for heating small
areas such as workshops up to
large areas such as industrial halls,
sports facilities, etc.
For economical heating, correct
calculation of the heat demand for
the required heat output for the
room is essential.

General preconditions

For installation of the units,
the local and country-specific
regulations and directives in the
latest version must generally be
observed.

The following work such as:

gas and electrical installation

change of gas type

commissioning

adjustment or maintenance

must only be carried out by
qualified specialists.

In addition to perfect electrical gas
installation, this ensures that all
necessary measurements and tests
are also carried out.

The units must be tested at

least once a year by authorised
specialists.

The units can constitute a hazard
if not installed and operated
correctly. Prior to planning and
installation of the units, the
following must be observed

The units must be installed and

operated so that there is no risk
to persons due to exhaust fumes
and radiated heat and fires
cannot occur

For installation of the units,

it must be ensured that the
discharging hot air has no
damaging effects on the
environment

Fire hazards must be prevented

depending on the materials of
the installation and mounting
surfaces. See TRGI, Section
5.1.3.3

Wall or ceilings intended for

mounting purposes must consist
of flame retardant materials.
Their load-bearing capacity must
be verified, reinforcements must
be provided if necessary

Brackets must be securely

anchored to walls or ceilings and
the units fastened to the same
at the points provided at the
factory

Adequate maintenance options

for the heat exchanger, burner,
fan and chimney duct must be
provided

Operating devices for the unit

and fuel supply must be able to
be operated from ground level.
Maintenance and repair options
must be provided by the
operator

It is recommended to conclude
a maintenance agreement with
the specialised company for this
purpose

For planning and installation of

the chimney duct, the structural
possibilities and pertinent local
and country-specific regulations
must always be observed

In environments subject to

heavy fouling, cleaning and
maintenance must be carried
out depending on the respective
conditions.
In these cases, the combustion
air must always be supplied
from the outside

Selecting the site of
installation

For selecting the site of installation,
account must be taken of the
requirements with respect to:

Fire protection and operational

risk

Function:

Room heating, low pressure
and excess pressure in the
installation room, etc

Operating requirements,

heat demand, nominal air
volume flow, circulation air
requirements, humidity, room
temperature, air distribution,
space requirement

Mounting, repair and

maintenance options.
The units must be mounted so
that they are easily accessible
at all times for repairs and
maintenance

The units must not be installed
in rooms with an explosive or
corrosive atmosphere!

ATTENTION

This manual is related to the following products: