Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.

Nortec assumes no responsibility for any material shortages beyond this period.

3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or

loss claims are to be made directly to the shipping company.

Before Installation

1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as

indicated on humidifier’s specification label.

2 Ensure that the dedicated fused disconnect provided for the humidifier is of sufficient size to

handle the rated amps as indicated on the specification label.

3 Ensure sufficient clearances will be available as described in “Location” on page 13.
4 Ensure steam lines can be routed to distributor as described in Steam Lines and

Condensate Returns on page 16.

Figure 1: Specification Label Location