Plumbing – Nortec MES2 User Manual
Page 18
15 | Installation
Plumbing
Figure 11: Water Supply and Drain Connection
All water supply and drain line connections should be installed in accordance with local
plumbing codes.
Supply water is recommended at 30 to 80 PSIG and 150-1200 Microsiemens (Hardness 0-
12 GPG). Consult factory for water conditions outside of this range. Install water shut off
valve before humidifier to facilitate servicing.
The drain line should not end in a sink used frequently by personnel, or where plumbing
codes prohibit it. Route to a floor drain or equivalent for safety reasons.
Ensure drain line is adequately sized to provide free and easy draining and that an air gap is
installed as shown. A restricted drain can cause cylinder water to over concentrate and
result in poor operation.
If a drain is not located near the humidifier use a condensate pump rated for hot drain water
such as Nortec’s P/N 1429527.
For humidifiers installed in some cities including the City of Los Angeles:
A city-approved spring-loaded double ball CHECK VALVE must be installed by
contractor on the potable water inlet to the humidifier. Recommended valve
manufacturer: Watts Regulator, Size 3/8” inlet and outlet, Model #7.
Each drain line from the humidifier must be routed, without dips or sags, to
terminate above the flood level rim of a city approved indirect waste receptor.
0.875 in. (22 mm). OD
un-threaded outlet
Always install a water
shut-off valve.
1/8 in. NPT
fill connection.
Air gap recommended.
1 1/2 in. to 7/8 in.
Copper reducer is ideal.
(Nortec option P/N 2522172)
Hose must not touch the bottom
of the funnel.
Min. 7/8 in. OD drain line.
Ensure adequate slope to
handle flow.
Use 1/2 in. OD copper
to within 4 ft (1.2 m) of
humidifier
*Elbows, pipe, water shut-off valve, and air gap reducer not supplied by Nortec.