MES2 Installation Checklist
Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________
Voltage: ________V/_____ph
Cylinder type:
Customer/Job:
Address:
WATER QUALITY:
Well
water
City water
POWER:
Voltage, amp, fuse per Spec Label:
yes no
Jumper 1-6 setting _________________
Jumper 8/9 settting ________________
Disconnect switch
yes no
HUMIDIFIER MOUNTING: (Clearances around the unit Acceptable Obstruction)
Humidifier level.
Cylinder removal clearance
STEAM LINE(S):
Material
Diameter / Size
Slope up (min 2 in/ft).
Slope down (min 0.5 in/ft)
Low point condensate traps
No hose kinks / Restrictions
Type of Insulation if installed
CONDENSATE LINE(S):
P Trap min 6 in or duct press + 2 in
P Trap sufficient drop to ensure flow
WATER LINE:
1/2 in to within 4ft of unit
Water pressure: 30-80 psig
DRAIN LINE:
Diameter / Size ______________ Air gap within 3 ft of the unit
CYLINDER:
Seated in drain valve and secured
yes no
WIRING:
Wiring connections and connectors secured
yes no
CONTROLS:
On / Off / Security loop devices working correctly yes no
Jumper J10 set to
Modulating (removed)
Or
On/Off (installed)
Jumper J26 set to
Terminal block input control (removed)
Or
Modbus control (installed)
Inspected by:
Date of inspection: ______/_______/______
Company: