INSTALLATION
HyPerformance HD4070
Instruction Manual
3-5
Placement of system components
• Place all system components in position prior to making electrical, gas and interface connections. Use the
diagram on the following page for component placement guidelines.
• Ground all system components to earth. See
Grounding requirements in this section for details.
• To prevent leaks in the system, tighten all gas and water connections as shown below:
Torque specifications
Gas or water
hose size
lbf-in
lbf-ft
kgf-cm
Up to 10 mm (3/8")
75-85
6.25-7
8.6-9.8
12 mm (1/2")
360-480
30-40
41.5-55
2WRENCHES