Double Rigging System
The Double Rigging System and Large Rigging Harness must be mounted for all
GF-8 Xten Versions. For each extension section there is a matching pair of rigging rods.
The rods for the 150cm sections are all identical. In principle, mounting the rigging requires
connecting the respective rods starting at the turnbuckles on the rigging harness and
finishing at the connection on the last arm section or in some cases the second last
section.
100cm / 3’ 3” arm section
127cm / 4ft arm section
150cm / 5ft arm section
160cm / 5’ 3” arm section
=
72 cm / 2’ 4” rigging rod
115cm / 3’ 9” rigging rod
142cm / 4’ 7” rigging rod
142cm / 4’ 7” and 115cm / 3’ 9” rigging rod
The following example describes the assembly procedure for the GF-8 Xten, Double
Rigging System as per Versions 7 & 8
Lower, front rigging
1.
Connect a 142cm / 4’ 7” rigging rod to the lower turnbuckle on the front side of the
large rigging harness. Ensure that the locking pin is inserted fully.
2.
Connect another 142cm / 4’ 7” rigging rod to the first rigging rod and in turn to the
second crane arm extension. Ensure that the locking pins are inserted fully. Hand
tighten the turnbuckles until the rigging rods are taut. The turnbuckles can be secured
with locking nuts.
Attention:
After mounting the lower front rigging continue with the crane
assembly.
Connecting the rods together
Double Rigging System