beautypg.com

Grip Factory Munich GF-8 User Manual

Page 26

background image

GF-8 Xten Crane System Instruction Manual

Page: 25

14. Connect two 150cm / 5’ parallelogram rods to the middle section and in turn to the

angle adjuster and secure the connections with the provided safety pins.

15. Connect the platform to the angle adjuster by inserting the male platform flange into

the female flange on the angle adjuster. Secure it with the safety pin.

16. Attach the weight bucket to the short end of the crane by inserting the male weight

bucket flange into the female flange on the angle adjuster. Secure it with the 2 safety
pins on the top of the angle adjuster.
Tip:

The angle adjuster has an integrated leveller. By turning it, the vertical plate
on the angle adjuster can be set to a perfect right angle. Correct setting of
the angle adjuster enhances the crane’s balance. Level the weight bucket,
the platform or the remote bracket before loading any weights.

17. Now the top front rigging system can be assembled. Therefor follow the instructions

as exemplary shown by version 7 and 8 on page 44.

Before operation, all locking pins, locking screws etc should be inspected to ensure
that all assembly sections are securely fastened.