Xten version 8 – Grip Factory Munich GF-8 User Manual
Page 39

GF-8 Xten Crane System Instruction Manual
Page: 38
Xten Version 8
(Pivot height 184cm / 6ft, Large Rigging Harness, Rear Extension 160cm / 5’ 3")
Front extension arms required
5 x 150 cm / 5’ + 127 cm / 4’ 2” + 100 cm / 3’ 3”
Rear extension arm required
1 x 160 cm / 5’ 3”
Lift range
1660 cm / 54’ 5”
Maximum Euro-adapter height
1054 cm / 34’ 6“
Lift capacity
50 kg / 110 lbs
Counterweight required for max. load
602 kg / 1324 lbs
Counterweight required to balance empty arm
350 kg / 770 lbs
Crane weight (excluding dolly and weights)
282 kg / 620 lbs
Dolly weight
80 kg / 176 lbs
Arm reach (pivot to camera head mount)
1083 cm / 35’ 6“
Length of rear end (pivot to outside of bucket)
253 cm / 8’ 3“
Double rigging is required! Observe guidelines on page 43 and additionally ensure
that the Large Rigging Harness is used with double rigging to the rear and front.
Continue from § 9, page 7
10. Connect one of the 150cm / 5’ sections to the middle section. Slip the connection
flanges into each other and secure them with the provided safety pin.
11. Connect another 150cm / 5’ section to the first 150cm / 5’ section. Slip the connection
flanges into each other and secure them with the provided safety pin.
Note:
After each mounted section the support stand or rostrum can be moved up to
the next fixed section. We recommend to support longer crane versions with
more than one support stand or rostrum.
12. Now the lower front rigging system can be assembled. Therefor follow the instructions
as exemplary shown by version 7 and 8 on page 43.
13. After the lower front rigging system was assembled and connected to the connectors
of the second 150cm / 5’ section connect another three 150cm / 5’ sections, the
127cm / 4’ 2” section and the 100cm / 3’ 3” section to the first ones. Slip the
connection flanges into each other and secure them with the provided safety pins.
Note:
After each mounted section the support stand or rostrum can be moved up to
the next fixed section. We recommend to support longer crane versions with
more than one support stand or rostrum.
14. Connect the remaining angle adjuster to the end of the 100cm / 3’ 3” section and
secure it with the provided safety pin.
Attention: Pinch point
15. Mount the parallelogram rod support to the respective section as shown on page 40.
16. Connect five 150cm / 5’ parallelogram rods, the 127cm / 4’ 2” rod and the 100cm / 3’
3” to the middle section and in turn to the angle adjuster and secure the connections
with the provided safety pins.
17. Connect the remote bracket to the angle adjuster by inserting the male remote
bracket flange into the female flange on the angle adjuster. Secure it with the safety
pin.
18. Attach the weight bucket to the short end of the crane by inserting the male weight