beautypg.com

V touring cart assembly, Assembly, Cabinet assembly to flying frame – d&b V-Series User Manual

Page 30

background image

3.3. V Touring cart assembly
The V Touring cart allows for a quick and easy setup of arrays as

the entire cabinet assembly stored in the cart can be directly

connected to the V Flying frame or mounted below already

suspended V8/V12 or V-SUB cabinets.

This type of setup is also very efficient when working space is

restricted.

3.3.1. Assembly
Remarks
For the assembly the same general preparations are made as

described in .

The setup should always be carried out by two persons.

The rigging procedure described below applies to both touring

cart options.

Splay link of the frame
For this type of setup, the Splay link of the frame must be attached

to «POSITION V8/V12». Check the position and alter it if

necessary as described in Þ Chapter 2.9. " Splay link of the

frame" Þ " Changing the Splay link position" on page 17.

3.3.1.1. Cabinet assembly to Flying frame
1. Prepare the touring cart
1. Move the cart to its assembly position.
2. Unlock the four fasteners (CamLocks) on the top lid and take

off the lid.

3. Unlock the four fasteners (CamLocks) on the bottom tray and

remove the connecting poles.

Splay link of the frame – «POSITION V8/V12»

d&b V-Series Rigging manual (1.9 EN)

30

This manual is related to the following products: