d&b T-Series User Manual
T-series rigging manual
Table of contents
Document Outline
- T-Series Rigging manual (1.1 EN)
- 2. T-Series rigging concept
- 3. Preparing the setup
- 4. T-Series arrays and assembly
- 4.1. Flown arrays
- 4.1.1. T10 Array
- Limitation
- Preparations
- Order of assembly
- 1. Suspend the Flying frame
- 2. Prepare the first T10 cabinet
- 3. Attach the Flying frame to the first T10 cabinet
- 4. Add further T10 cabinets
- 5. Rig the cabling
- 6. Check the assembly
- 7. Derig the array
- 4.1.2. T-SUB Column
- Limitation
- Preparations
- Order of assembly
- 1. Suspend the Flying frame
- 2. Prepare the first T-SUB cabinet
- 3. Attach the Flying frame to the first T-SUB cabinet
- 4. Add the next T-SUB cabinet
- 5. Rig the cabling
- 6. Check the assembly
- 7. Derig the array
- 4.1.3. T-SUB/T10 Array
- Preparations
- Order of assembly
- 1. Suspend the Flying frame
- 2. Attach the T-SUB cabinets
- 3. Prepare the first T10 cabinet
- 4. Attach the first T10 cabinet
- 5. Add further T10 cabinets
- 6. Rig the cabling
- 7. Check the assembly
- 8. Derig the array
- 4.1.4. Setup of the E7451 Touring case assembly
- E7451 Touring case 4 x T10 assembly
- Preparations
- Order of assembly
- 1. Suspend the Flying frame
- 2. Prepare the T10 cabinets in the touring case
- 3. Attach the Flying frame to the assembly
- 4. Attach the next assembly
- 5. Rig the cabling
- 6. Check the assembly
- 7. Derig the array
- E7451 Touring case assembly below T-SUB cabinets
- 4.2. T-Series ground stacks
- 4.2.1. T10 ground stack
- Limitation
- Preparations
- Order of assembly
- 1. Prepare the Flying frame
- 2. Prepare the first T10 cabinet
- 3. Attach the first T10 cabinet
- 4. Set vertical aiming of the first T10 cabinet
- 5. Add further T10 cabinets
- 6. Rig the cabling
- 7. Check the assembly
- 8. Derig the ground stack
- 4.2.2. T-SUB/T10 ground stack
- Limitation
- Preparations
- Order of assembly
- 1. Stack the two T-SUB cabinets
- 2. Attach the first T10 cabinet
- 3. Set vertical aiming of the first T10 cabinet
- 4. Add further T10 cabinets
- 5. Rig the cabling
- 6. Check the assembly
- 7. Derig the ground stack
- 4.2.3. T-SUB stacks
- 4.1. Flown arrays
- 5. Checklist for the assembly of T-Series arrays
- 6. Wind loads
- 7. Care and maintenance / Disposal
- EC Declaration of Conformity