Setup preparation, Flown arrays, Setup preparation 3.2. flown arrays – d&b V-Series User Manual
Page 22
3.1. Setup preparation
Check the acoustical and mechanical setup using ArrayCalc and
prepare enough printouts for each array.
The plan enables the riggers to set up the suspension points, the
securing points and the chain hoists.
When on site first:
–
Clear the working areas and ensure there is enough space to
set up and lift the array.
–
Check that the hoists are exactly in the specified position.
–
Ensure the chains are not twisted.
Inspections before setup
Before setup carry out a visual inspection of all system components
for faults. This also includes the loudspeakers and in particular the
rigging parts of the cabinets (Front and Splay/Rear links).
Damaged components must be withdrawn from use immediately.
Please follow the instructions given in Þ Chapter 7. "Care and
maintenance / Disposal" on page 43.
3.2. Flown arrays
Flown arrays are suspended using the Z5380 V Flying frame.
1. Suspend the Flying frame according to the chosen type of
suspension as described in Þ Chapter 2.7. "Suspension of the
2. At this point we recommend you to attach the secondary
safety device using the Z5382 V Safety chainset as described
in Þ Chapter 2.8. "Secondary safety" on page 16.
3. Prepare the cables and link cables according to the number of
amplifier channels and cabinets used.
d&b V-Series Rigging manual (1.9 EN)
22