V8/v12 array – d&b V-Series User Manual
Page 23
3.2.1. V8/V12 Array
Preparations
For this type of setup the Splay link of the frame must be attached
to «POSITION V8/V12». Check the position and alter it if
necessary as described in Þ Chapter 2.9. " Splay link of the
frame" Þ " Changing the Splay link position" on page 17.
1. Prepare the first cabinet
Prepare the Front and Splay links of the first cabinet as described
in Þ Chapter 2.11. " Cabinet rigging mechanism" on page 19.
2. Attach the Flying frame to the first cabinet
1. Lower the frame onto the cabinet until the Front links fit into the
slots at the front of the frame.
2. Insert and lock the second Locking pins of the cabinet's Front
links on both sides.
3. Release the Locking pin that keeps the frame's Splay link in its
park position.
4. Fold out the Splay link and reinsert the Locking pin.
5. On the rear rigging strand of the cabinet, insert and lock the
first Locking pin of the cabinet in the
[0°] hole.
6. Slightly lower the frame and fold in the Splay link.
7. Lift the frame until the hook of the Splay link hooks into the
preset Locking pin.
8. Insert the second Locking pin (Safety pin) to secure the frame's
Splay link in place.
Splay link of the frame – «POSITION V8/V12»
d&b V-Series Rigging manual (1.9 EN)
23