d&b V-Series User Manual
Page 24
3. Add further cabinets
1. Prepare the Front and Splay links of the next cabinet as
described in Þ Chapter 2.11. " Cabinet rigging mechanism"
2. Preselect the splay angle according to your ArrayCalc
simulation.
3. Lift the frame to a suitable working height.
4. Attach the prepared cabinet to the corresponding slots on the
front of the upper cabinet.
5. Insert and lock the second Locking pins of the cabinet's Front
links on both sides.
6. Raise the bottom cabinet until the Splay link of the upper
cabinet has hooked into the preset Locking pin.
7. Release the cabinet and insert the second Locking pin (Safety
pin) to secure the Splay link.
To add further cabinets proceed in the same manner until the
assembly is completed.
4. Rig the cabling
1. Connect the flying cables and link cables according to the
number of amplifier channels and cabinets used.
2. Attach the cable pick.
5. Check the assembly
Before hoisting the array to its operating position recheck the
actual status of the entire assembly according to the checklist given
in Þ Chapter 4. "Safety and system checks" on page 39.
d&b V-Series Rigging manual (1.9 EN)
24