d&b V-Series User Manual
Page 29
4. Lower the assembly onto the frame until
the Front links fit into the slots at the front of the frame
and the Rear link fits into the track of the frame's center bar.
5. Insert the second Locking pins of the Front links on both sides.
6. On the rear rigging strand of the cabinet, insert the (first)
Locking pin of the cabinet's Rear link to the fixing hole of the
frame's center bar.
7. Release the Locking pin of the cable pick and insert it to the
second fixing hole of the frame's center bar.
3. Add V8/V12 cabinets below the SUBs
Adding V8/V12 cabinets below the SUBs is similar to the setup of
a flown V8/V12 array as described in .
4. Rig the cabling
1. Connect the flying cables and link cables according to the
number of amplifier channels and cabinets used.
2. Attach the cable pick.
5. Check the assembly
Before hoisting the array to its operating position recheck the
actual status of the entire assembly according to the checklist given
in Þ Chapter 4. "Safety and system checks" on page 39.
d&b V-Series Rigging manual (1.9 EN)
29