Getting started, Before you begin, Inspect the board – Altera Transceiver Signal Integrity User Manual
Page 11: References, Chapter 2. getting started, Before you begin –1, Inspect the board –1, References –1
![background image](https://www.manualsdir.com/files/763783/content/doc011.png)
February 2013
Altera Corporation
Transceiver Signal Integrity Development Kit,
Stratix V GT Edition User Guide
2. Getting Started
The remaining chapters in this user guide lead you through the following board setup
steps:
■
Inspecting the contents of the kit
■
Installing the design and kit software
■
Setting up, powering up, and verifying correct operation of the development
board
■
Configuring the Stratix V GT FPGA
■
Running the Board Test System designs
f
For complete information about the development board, refer to the
Before You Begin
Before using the kit or installing the software, check the kit contents and inspect the
board to verify that you received all of the items listed in
.
If any of the items are missing, contact Altera before you proceed.
Inspect the Board
To inspect the board, perform the following steps:
1. Place the board on an anti-static surface and inspect it to ensure that it has not been
damaged during shipment.
c
Without proper anti-static handling, you can damage the board.
2. Verify that all components are on the board and appear intact.
3. For proper Stratix V GT device cooling, install the heatsink/fan included with the
kit using the provided heatsink/fan installation tool.
f
For more information about power consumption and thermal modeling, refe
References
Use the following links to check the Altera website for other related information:
■
For the latest board design files and reference designs, refer
page.
■
For the Stratix V GT device documentation, refer to the
■
To purchase devices from the eStore, refer to the