Assemble drill string, Jt20 operator’s manual – Ditch Witch JT20 User Manual
Page 94
JT20 Operator’s Manual
Conduct a Bore - 93
Assemble Drill String
CMW
®
Assemble Drill String
1.
bit
2.
beacon housing
3.
adapter
4.
collar
5.
transition sub
6.
JT20 drill pipe
Prepare Beacon Housing
1.
Select nozzles and bit.
2.
Insert nozzle into beacon housing.
3.
Attach bit to beacon housing.
4.
Install beacon, following beacon instructions for:
•
battery replacement
•
beacon positioning.
5.
Install beacon housing lid.
6.
Follow beacon instructions to check beacon operation.
7.
Follow tracker instructions to calibrate beacon.
Attach Transition Sub
1.
Remove blocks from pipe guides.
2.
Pull transition sub into front wrench.
3.
Close wrench.
4.
Lube joints.
5.
Use machine torque to tighten joint fully.
IMPORTANT: A variety of nozzles and bits are available to suit your particular job conditions.
See + for more information, or contact your Ditch Witch
®
dealer.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)